• Home
  • About Us
  • Services
    • CCTV Surveys
    • High Pressure Water Jetting
    • Silt Pusher
    • Specialist Works
    • Relining
    • Maintenance
    • Asset Management
  • Clients
  • Case Study
    • Case De silting
    • Case Dewatering
  • Careers
  • News
  • Contact Us
    • Copyright
    • Site map
    • Privacy
  • Client Section

Call us toll free 01945 450925

Find us on Map
info@adcdrainage.co.uk
Login

Login
ADC Drainage
  • Home
  • About Us
  • Services
    • CCTV Surveys
    • High Pressure Water Jetting
    • Silt Pusher
    • Specialist Works
    • Relining
    • Maintenance
    • Asset Management
  • Clients
  • Case Study
    • Case De silting
    • Case Dewatering
  • Careers
  • News
  • Contact Us
    • Copyright
    • Site map
    • Privacy
  • Client Section
Channel Five

Channel Five

Aug 12, 2015 | Posted by admin | Uncategorized |
News: ADC star in Supersize Grime
Source: Channel 5
Date: Autumn 2011

ADC worked alongside the Environment Agency to star in the hit Channel 5 series Supersize Grime. Steve Paige & Tim Cheshire (Environment Agency) lead the ADC team to clearing a critical culvert in London.

ADC on Channel 5

news-channel-five-3
news-channel-five-4
news-channel-five-6
news-channel-five-7
news-channel-five-8
news-channel-five-9
Watch the Episode

Unfortunately due to media rights we can only link to the whole episode, and you will have to endure the adverts. The following times are for the ADC parts.

  • Part 1: 8.00 – 12.20
  • Part 2: 20.20 – 23.25
  • Part 3: 28.00 – 31.50
Blocked Culvert threatens flooding of local properties

Once the affected area in Uxbridge was surveyed, Tim Cheshire (Environment Agency) called into head office to check for any flooding events which may threaten the safety of the operation.

Stage1

The river running into the blocked culvert was dammed and some initial floating debris was cleared. ADC are experienced in confined space work.

Stage 2

Gas monitors were fitted to the team, as River Silt can release dangourous gases. ADC, who have a strong policy for being environmentally conscious, then set about rescuing the fish. ADC also use “fish friendly” pumps.

Stage 3

The robot camera, the very latest technology built by Rico (Germany), was deployed to survey and feedback images of the culvert to the vans computers. ADC were able to check for structural defects, debris etc. During the survey amoungst other debris a boat was found jammed deep in the culvert.

0
Share

About admin

This author hasn't written their bio yet.
admin has contributed 5 entries to our website, so far. View entries by admin.

Contact Us

We're currently offline. Send us an email and we'll get back to you, asap.

Send Message

© 2025 · Your Website. Theme by HB-Themes.

Prev Next